Croatia marks connection of long-awaited Peljesac Bridge

2021-July-30 14:54 By: Xinhua

Photo taken on July 28, 2021 shows the final piece of steel box girder being lifted at Mali Ston Bay near Komarna of southern Croatia. The final piece of steel box girder for the Peljesac Bridge in southern Croatia was lifted and welded with the main structure on late Wednesday night. The 2.4-km cable-stayed bridge over the Mali Ston Bay of the Adriatic Sea connects Croatian mainland and the Peljesac Peninsula of its southernmost Dubrovnik-Neretva County, bypassing a short strip of Bosnian and Herzegovina's territory. (Grgo Jelavic/Pixsell via Xinhua)

Editor: GSY
More from Guangming Online

Disclaimer

The views and opinions expressed in this article are those of the author's, GMW.cn makes no representations as to accuracy, suitability, or validity of any information on this site and will not be liable for any errors, omissions, or delays in this information.

点击右上角微信好友

朋友圈

请使用浏览器分享功能进行分享