Photo taken on July 29, 2021 shows fireworks celebrating the successful connection of the Peljesac Bridge at Mali Ston Bay near Komarna of southern Croatia. The final piece of steel box girder for the Peljesac Bridge in southern Croatia was lifted and welded with the main structure on late Wednesday night. The 2.4-km cable-stayed bridge over the Mali Ston Bay of the Adriatic Sea connects Croatian mainland and the Peljesac Peninsula of its southernmost Dubrovnik-Neretva County, bypassing a short strip of Bosnian and Herzegovina's territory. (Ivo Cagalj/Pixsell via Xinhua)
点击右上角微信好友
朋友圈
请使用浏览器分享功能进行分享