Shenzhen Metro Line-16 begins trial run

2022-December-29 18:33 By: GMW.cn

Shenzhen Metro Line-16 begins trial run

Shenzhen Metro Line-16 opens for trial operation on Dec. 28, 2022, southeast China’s Shenzhen City. Line-16 is the planned line of the fourth phase of Shenzhen rail transit, starting at Dayun Station and ending at Tianxin Station, with a total length of 29.2 km. The opening of this line is of great significance to improve the traffic environment and optimize the urban spatial layout in the eastern part of the city. (Peng Peng/Guangming Picture)

Shenzhen Metro Line-16 begins trial run

Shenzhen Metro Line-16 opens for trial operation on Dec. 28, 2022, southeast China’s Shenzhen City. Line-16 is the planned line of the fourth phase of Shenzhen rail transit, starting at Dayun Station and ending at Tianxin Station, with a total length of 29.2 km. The opening of this line is of great significance to improve the traffic environment and optimize the urban spatial layout in the eastern part of the city. (Peng Peng/Guangming Picture)

Shenzhen Metro Line-16 begins trial run

Shenzhen Metro Line-16 opens for trial operation on Dec. 28, 2022, southeast China’s Shenzhen City. Line-16 is the planned line of the fourth phase of Shenzhen rail transit, starting at Dayun Station and ending at Tianxin Station, with a total length of 29.2 km. The opening of this line is of great significance to improve the traffic environment and optimize the urban spatial layout in the eastern part of the city. (Peng Peng/Guangming Picture)

Editor: WXL
More from Guangming Online

Disclaimer

The views and opinions expressed in this article are those of the author's, GMW.cn makes no representations as to accuracy, suitability, or validity of any information on this site and will not be liable for any errors, omissions, or delays in this information.

点击右上角微信好友

朋友圈

请使用浏览器分享功能进行分享