The Three Gorges lock resume its normal operation mode of "north route inbound, south route outbound" after a two-day reversing operation on Feb. 12, 2023. The number of ships to be locked above and below the Three Gorges Dam is basically balanced. According to the Three Gorges Navigation Administration of the Yangtze River, the two-day reversing operation of the north route of the Three Gorges locks has ended. A total of 60 locks have been operated, and 226 ships, 856,800 tons of cargo and 77,000 tons of basic life materials have passed through, effectively adjusting the asymmetric backlog of ships waiting to be locked at the Three Gorges. (Huang Shanjun/Guangming Picture)
点击右上角微信好友
朋友圈
请使用浏览器分享功能进行分享