First high-salt, high-mineralized mine water floating power station connected to Ningxia Power grid

2024-May-10 13:53 By: GMW..cn

First high-salt, high-mineralized mine water floating power station connected to Ningxia Power grid

Photo taken on May 6, 2024 overlooks China's first floating distributed photovoltaic power generation project on mine water body. The 5.1 megawatt floating distributed photovoltaic power generation project on a mine water body in Majiatan Town, Lingwu City, Ningxia Hui Autonomous Region, successfully connected to the Ningxia power grid on May 6, marking the full-capacity operation of the first high-salt, high-mineralized mine water floating power station in the country. (Yuan Hongyan/Guangming Picture)

First high-salt, high-mineralized mine water floating power station connected to Ningxia Power grid

Photo taken on May 6, 2024 overlooks China's first floating distributed photovoltaic power generation project on mine water body. The 5.1 megawatt floating distributed photovoltaic power generation project on a mine water body in Majiatan Town, Lingwu City, Ningxia Hui Autonomous Region, successfully connected to the Ningxia power grid on May 6, marking the full-capacity operation of the first high-salt, high-mineralized mine water floating power station in the country. (Yuan Hongyan/Guangming Picture)

Editor: ZAD
More from Guangming Online

Disclaimer

The views and opinions expressed in this article are those of the author's, GMW.cn makes no representations as to accuracy, suitability, or validity of any information on this site and will not be liable for any errors, omissions, or delays in this information.

点击右上角微信好友

朋友圈

请使用浏览器分享功能进行分享