Asia's first cylindrical FPSO finishes main body construction

2023-December-8 10:35 By: GMW.cn

亚洲首艘圆筒型浮式生产储卸油装置主体建造完工

The main body of Haiyang Shiyou 122, Asia's first cylindrical floating, production, storage, and offloading (FPSO) facility, is completed in Qingdao, according to China National Offshore Oil Corporation on December 6, 2023. (Zhang Jingang/Guangming Picture)

亚洲首艘圆筒型浮式生产储卸油装置主体建造完工

The main body of Haiyang Shiyou 122, Asia's first cylindrical floating, production, storage, and offloading (FPSO) facility, is completed in Qingdao, according to China National Offshore Oil Corporation on December 6, 2023. (Zhang Jingang/Guangming Picture)

Editor: GSY
More from Guangming Online

Disclaimer

The views and opinions expressed in this article are those of the author's, GMW.cn makes no representations as to accuracy, suitability, or validity of any information on this site and will not be liable for any errors, omissions, or delays in this information.

点击右上角微信好友

朋友圈

请使用浏览器分享功能进行分享